← Back to Our Work

24th — South Linden Zombie Property Gut Remodel, Rented Five Years and Sold


24th — South Linden Zombie Property Gut Remodel, Rented Five Years and Sold

We always called this one 24th. It is a two-story house in South Linden, and it came to us through an out-of-state investor. We were already repairing a duplex he owned a couple of blocks over, and he asked us to quote the repairs it would take to get this house rent ready.

He had been burned. The property management company he hired was collecting the tenants' rent and telling him the tenants were not paying, and the same company was in charge of the repairs. By the time we walked the house, the interior was half demolished. Getting it rent ready was not a repair list anymore. It was a full gut: new electric, new plumbing, new HVAC, insulation, drywall, a kitchen, windows and a roof.

The investor did not want to put that kind of money into it. So we made him an offer for the house, and he accepted.

From there it was our own project. We gut remodeled it in 2018 with mid-grade materials and rented it for five years. In 2024 we went back through it with a lighter remodel and sold it at the top of the market. The photos cover both rounds: the house as we found it, the 2018 rebuild, and the 2024 refresh that took it to market.

Before


The outside told most of the story on the first inspection. The front yard had grown up over the porch steps, a window on the side of the house was boarded over, and the front porch roof was worn through to the decking.

Inside, the house was half demolished. Demolition had been started and then left, and nothing that remained of the finishes was worth keeping. The electrical, the plumbing and the heating all had to be replaced, not repaired. The basement was dark and dirty, with peeling paint and debris across the floor.

A full gut was the only way forward. Everything that was left of the finishes and the systems had to come out before anything could be rebuilt.

During


The 2018 work started by finishing the demolition someone else had begun, then closing up the shell. A new roof went on and new windows went in.

With the house open, we changed the layout where it paid off. The kitchen was rearranged into an open layout with the dining room. We raised the ceiling height in the stairwell. In the bathroom we framed a new wet wall for a walk-in shower, and we put the laundry on the second floor, on the same level as the bedrooms.

Then the systems, all of them new: electric, plumbing, and HVAC with a new furnace and air conditioning. In the living room the ductwork runs inside a new chase that we built out as an accent wall at the fireplace, so the duct is hidden and the wall looks intentional. A sump pump went into the basement. Fresh insulation went in, and then drywall through the whole house.

Finishes were mid-grade and picked for a rental: new kitchen cabinets with laminate countertops, new fixtures, and a tile surround in the walk-in shower. Outside, we built new steps with a railing.

The house rented for five years.

In 2024 we went back in for a lighter remodel ahead of the sale. The laminate countertops came out for granite. The cabinets were refreshed and got new hardware. New LVP flooring went down, the bedrooms got new carpet, and the bathroom got a new floor and a new vanity. Paint came last: the interior, the exterior and the basement.

After


The house that went to market in 2024 is the 2018 rebuild with a new set of finishes on it.

The kitchen has white shaker cabinets with black hardware, granite countertops with a granite bar top, a white subway tile backsplash and stainless appliances, under recessed lights. It is open to the dining room, and a wide cased opening connects both to the living room, so the first floor reads as one space. Wood-look LVP runs through all of it. In the living room the painted brick fireplace sits against the accent wall that hides the ductwork.

Upstairs, both bedrooms have new carpet and fresh paint, and the laundry is on the same floor. The bathroom has its walk-in shower with a gray tile surround and a built-in niche, a new stone-look tile floor and a new dark vanity with a white top, with daylight from a glass block window.

The basement is clean and painted, with the furnace, the water heater and the sump pump out where you can see them. Outside, the siding and trim are repainted and the front porch has a sound roof over it again.

An investor did not want to fix this house. We bought it, rebuilt it, rented it for five years and sold it at the top of the market. It was an excellent investment for us.

Thinking about a project?

Tell us what you have in mind. A builder — not a salesperson — replies within one business day.

Schedule a free phone consultation

Pick a time and we call you — or skip this and send a message below.

    Looking for open times…

    Pick a date →

    or just message us

    Prefer the full form? Use the contact page.