Whole-Home Remodeling Contractor in Columbus, Ohio


Occupied houses reworked room by room and vacant ones brought back from derelict — structure, systems and finishes under one contract.

Whole-Home Remodels & Zombie Properties · Columbus, Ohio

This page is for two kinds of owner. Columbus homeowners who want to rework the whole plan of the house they already have — open the first floor, add a bath, replace the kitchen and the systems in one project instead of five. And investors and landlords who have bought, or are about to buy, a house that has sat empty: a foreclosure, a tax-delinquent sale, a sheriff’s-auction or land-bank purchase — what Columbus calls a zombie property. We work in Columbus, Dublin, Upper Arlington, Hilliard, Westerville, Delaware and Powell.

A zombie property is the same job as any other whole-home remodel; the house has just sat, so there is more of it. Every system is assumed dead until it is proven otherwise, a previous contractor’s work is assumed wrong until it is inspected, and the structure is looked at before anything is priced. That is the work we are built for: we can handle it all, no matter how derelict the property. An occupied house is phased so you can live through it; a vacant one has no phasing at all, which is why it moves faster.

What’s included

How we work

  1. A free first call Twenty to thirty minutes on what you own or are about to buy: the property, its size, how long it has sat, what a previous owner or contractor did to it, and what you need it to be at the end — a home, a rental, a sale. The neighborhood usually tells us the age of the house, and the age tells us most of what the walls hide.
  2. A walk-through — before the purchase where you can Where the sale allows access, we walk the house with you before you commit; a scope and contingency built from what the house shows beats a guess. On-site consultation is $225 per hour, billed as work performed; a written estimate is a one-time $125 and is credited toward the project if you contract with us. Where the sale is as-is and sight-unseen, whatever could not be inspected is priced as if it needs replacing.
  3. Scope and contract The survey becomes a written scope of work with allowances and a contingency budget sized to what could not be inspected, agreed before demolition. Design-build work is a mix: subcontracted trades are billed cost-plus with a stated 20 percent fee, and the tasks our own crew self-performs are billed time and materials at our published rates with nothing added on top. The estimate is built from the averages of the work we have performed, and the deposit at signing is set per job — special-order items, quantity-priced materials and the size of the project decide it. Billing is progress invoices, typically weekly as the work completes, or a draw schedule written into the contract — matched to your lender’s draws if the project is financed. Financing up to $30,000 is available through our payment portal, subject to credit approval.
  4. Permits and make-safe We patch the roof, secure the house and get the utilities back on if that is what it takes to work safely, then submit to the jurisdiction the parcel falls under, track the applications to issuance and hold a pre-construction conference on schedule, access and change orders.
  5. Construction and close-out Structure first, then the standard sequence: framing, rough trades, insulation, drywall, finishes. Weekly progress photos go wherever you are — the Martin house was run for an owner in California we did not meet until the final walkthrough — and the job closes with a punch list, every permit signed off and, where required, a certificate of occupancy.

Two of ours: the Martin house and Chicago Avenue

The Martin house in Franklinton came to us half-worked by a low-bid contractor: framed drop ceilings, partition walls on both floors and an LVL beam with no connection to the foundation. All of it came out. Underneath were termite-damaged joists, a rotted sill plate, a chimney cut off below the roof line and hidden, and a section of rubble foundation that had to be rebuilt. The owner, an investor in California, never met us until the final walkthrough; the job ran on a progress-photo album and video messages, and finished as a three-bed, two-bath house with a custom kitchen and two custom baths, nobody living in it while we worked.

Chicago Avenue was a sheriff’s-auction purchase headed for the rental market. Its rear addition had a hole in the roof, a rotted wall and floor beneath it, and no foundation at all — it sat on the ground. We shored the roof, built pier foundations and a new floor system, reinforced the original rubble foundation, removed a dead chimney, and replaced every system in the house: furnace, air conditioning, panel, wiring, plumbing. It passed every inspection, received its certificate of occupancy, and rents.

The previous contractor’s partition framing inside the gutted Martin house
Before: the previous contractor’s framing, all of it removed
The finished Martin kitchen after the whole-home gut remodel
After: the finished kitchen

Recent projects

Questions we hear

Do we have to move out?

For an occupied house, usually not for the whole job: we phase it so a kitchen or a bath is out of service for weeks, not the house for months, and we plan that sequence with you. A vacant house is the easy case — nobody lives there, nothing is phased, and the job runs straight through.

What is a zombie property, and do you take them on?

A house stuck between owners: the occupant left, a foreclosure stalled or the taxes went unpaid, and nobody maintained it. They come to market through sheriff’s auctions, the land bank and as-is sales, often with no inspection before you own them. Yes, we take them on — the Martin house and Chicago Avenue on this page were both zombie properties, and the second had an addition sitting on the ground with no foundation under it.

Do you work with out-of-state owners?

Yes. The Martin house was bought by an investor in California who found us through a blog post and never met us in person until the final walkthrough. The whole project ran on a progress-photo album and video messages, with the project manager as the owner’s single point of contact.

Can you look at a house before I buy it?

Yes, and where the sale allows access it is the cheapest insurance available. A walk-through turns the budget from a guess into a scope plus a contingency built from what the house actually shows, while walking away is still an option. Consultation time is billed at $225 per hour.

How is a whole-home remodel priced?

Design-build work is a mix: subcontracted trades are billed cost-plus with a stated 20 percent fee, and the tasks our own crew self-performs are billed time and materials at our published rates with nothing added on top. The estimate is built from the averages of the work we have performed, and the deposit at signing is set per job — special-order items, quantity-priced materials and the size of the project decide it. The contingency for what could not be inspected is a separate line, agreed before demolition, and anything beyond it is a written change order before the work happens.

How long does a whole-home remodel take?

Plan on three to twelve months, sometimes more, depending on the structural work, the jurisdiction’s plan review and how much of the house is being replaced. A vacant house runs faster than an occupied one because nothing is phased. We commit to a schedule at the pre-construction conference.

Start your project

Tell us what you are planning. We reply within one business day, and the first call is free.

Start your project See our whole-home work

If the house only needs more room, or one room, we also handle home additions and kitchen remodeling.

Thinking about a project?

Tell us what you have in mind. A builder — not a salesperson — replies within one business day.

Prefer the full form? Use the contact page.